11
Kas
RVNL Bhanupalı-Bılaspur-Berı T8-T10

This project includes Detailed Design and Project Management Consultancy services during preconstruction and construction stage of various works in connection with construction of Tunnel no. 8 to Tunnel no. 10 and will broadly involve related railway formation works, drainage system, stability of slope on approaches of these Tunnels including minor

04
Kas
RVNL Bhanupalı-Bılaspur-Berı T11-T16

This project includes Detailed Design and Project Management Consultancy services during preconstruction and construction stage of various works in connection with construction of Tunnel no. 11 to Tunnel no. 16, bridges, cutting locations, yards and will broadly involve related railway formation works, drainage system, stability of slope on approaches of

04
Kas
Ahmedabad Metro Raıl Project

General Engineering Consultancy Services for overall projectmanagement, procurement, Design review and/or Proofchecking, testing and commissioning of the Ahmedabad Metro Rail Project-Phase II of GMRC for total length of 28.254 km having two corridors Motera Stadium to Mahatma Mandir (22.838 km) and Gujarat National Law University to GIFT City (5.416 km)

04
Kas
RVNL Rıshıkesh Package-9

The project includes survey, detailed design, engineering services, construction supervision, and project management consultancy for the section, between 117+365 to 125+320 (7.955 km), of a single line broad gauge railway, connecting Riskikesh to Karanprayag. The project includes 2 tunnels, 1 bridge with a length of 130m, and 1 station with

27
Eyl
RVNL Rıshıkesh Package-4

Rail Vikas Nigam Limited, India Name of Work : Detailed Design and Project Management Consultancy for Construction of tunnels (with both NATM and TBM alternative), yards and formation works from Chainage 47+360 to 63+117 (15.757 km) under Package-4 in connection with new single line Broad Gauge rail link between Rishikesh

03
Eki
GAZIRAY

Construction supervision, consultancy and engineering services of 25,6 km high speed railway with 160 km/h operation speed, 1 metro line with 80 km/h operation speed, and double track suburban railway with 80 km/h operation speed. The project includes 26 culverts, 5 underpasses, 5 overpasses, 1 pedestrian underpasses, 2 underground stations,

03
Eki
Istanbul Aırport Metro

Construction supervision and consultancy of 69.5 km of double tube metro line (TBM) with 120 km/h operation speed. The project includes 17 underground stations, 2 depot areas, 69.5 km double tube TBM metro tunnel, 1500 V DC third rail electrification, all infrastructures works, track works, superstructure and stations, structural, architectural,

03
Eki
Banaz Esme Hıgh Speed Raılway

Construction supervision and consultancy services of 96.6 km double - track high speed railway with 250 km/h operation speed. The project includes 3 stations and siding stations, 136 culverts, 41 underpasses, 34 overpasses, 7 viaducts and 5 bridges

31
Mar
Ankara Sıvas Hıgh Speed Raılway

Construction supervision and consultancy services of 143 km double-track high speed railway with 250 km/h operation speed. The project includes 209 culverts, 52 underpasses, 30 overpasses, 24 bridges with the total length of 5,963.77 meters, 4 highway junction bridges in 2 x (16.5 x 7 m) dimensions and with the

31
Ağu
Ankara Sıvas Hıgh Speed Raılway (Sectıon III)

Construction supervision and consultancy services of 27.5 km double The project includes construction supervision of 27.5 km double-track high speed railway with 250 km/h operation speed. 25 culverts, 11 underpasses, 3 overpasses, 9 viaducts, 1 bridge, 2 cut&cover tunnels and 6 NATM tunnels [gallery columns="2" link="none" size="full" ids="1555,1557"]