11
Kas
RVNL Bhanupalı-Bılaspur-Berı T8-T10

This project includes Detailed Design and Project Management Consultancy services during preconstruction and construction stage of various works in connection with construction of Tunnel no. 8 to Tunnel no. 10 and will broadly involve related railway formation works, drainage system, stability of slope on approaches of these Tunnels including minor

04
Kas
RVNL Bhanupalı-Bılaspur-Berı T11-T16

This project includes Detailed Design and Project Management Consultancy services during preconstruction and construction stage of various works in connection with construction of Tunnel no. 11 to Tunnel no. 16, bridges, cutting locations, yards and will broadly involve related railway formation works, drainage system, stability of slope on approaches of

04
Kas
RVNL Rıshıkesh Package-9

The project includes survey, detailed design, engineering services, construction supervision, and project management consultancy for the section, between 117+365 to 125+320 (7.955 km), of a single line broad gauge railway, connecting Riskikesh to Karanprayag. The project includes 2 tunnels, 1 bridge with a length of 130m, and 1 station with

27
Eyl
RVNL Rıshıkesh Package-4

Rail Vikas Nigam Limited, India Name of Work : Detailed Design and Project Management Consultancy for Construction of tunnels (with both NATM and TBM alternative), yards and formation works from Chainage 47+360 to 63+117 (15.757 km) under Package-4 in connection with new single line Broad Gauge rail link between Rishikesh

01
Oca
Gerede Merzıfon Motorway

Survey, feasibility studies, preliminary and detailed design and engineering services of 346.3 km highway between Gerede and Merzifon. The project includes 6 lane (2x3) highway with a total length of 318.8 km, 4 lane (2x2) connection roads with the total length of 27.5 km, 571 culverts and underpasses, 54 overpasses,

03
Eki
Raılway and Road connectıons to Fılyos Port

Survey, detailed design and engineering services of 12.005 km single track conventional mix use (freight + passanger) railway with 50 km/h operation speed connecting Filyos Industrial Zone to Filyos Port, and 4.27 km² lane (2x1) connection road. The project includes 2 stations, 1 overpass bridge, 1 highway bridges with a

03
Eki
Erzurum Raıl System

Survey, feasibility detailed design and engineering services of 19 km double - track tramway line connecting major locations within the city of Erzurum with 50 km/h operation speed. The project includes 15 stations.  

04
Eki
Karabuk Hıghway (Sectıon I)

Survey, feasibility, detailed design and engineering services of 16.25 km 4 lane (2x2) highway in Karabuk. The project includes 5 overpasses, 2 viaducts with the total length of 1.8 km, 2 bridges with the total length of 100.6 m, 4 double tube tunnels with a total length of 2.67 km

04
Eki
Cerkes Kursunlu Hıghway

The project includes survey, feasibility, detailed design and engineering services of 34 km 2 lane (2x1) state road connecting Cerkes to Sabanozu in Bartın.