Survey, feasibility, detailed design and consultancy services of 1.146 km metro line with 80 km/hr operation speed in Izmir. The
-
Contract Date: 2014
-
client: General Directorate of Highways
-
Name of Work: Surveying, Detailed Design and Engineering Services of Sakaltutan Tunnel