• Contract Date: 1999
  • client: Istanbul Olympic Games Preparation and Organizing Committee
  • Name of Work:
    Preparation of Settlement Plan of Atatürk Olympic Park, Revised Project Reports (Preliminary, Application, Bill of Quantity Survey), Architectural, Enginnering, and Technical Consultancy Services

Ataturk Olympıc Park

 

Preparation of settlement plan of Ataturk Olympic Park (585 hectares), and detailed project report of connection roads and residental road with a total length of 26.34 km, 8 culverts, 1 intersection bridge, 2 rotary intersection (102,6 hectares), potable water distribution pipeline system with a total length of 17,334 m, sewage system with a total length of 18,412 m, storm water system with a total length of 25,175 m, natural gas piping systems with a diameter of 200 cm, electrification and telecommunication systems, electric distribution facilities with a total construction area of 1,460 m².

 

Related Projects