Survey, feasibility, preliminary and detailed design, and engineering services of 158.78 km double-track mix use conventional railway with 90 km/h
-
Contract Date: 1999
-
client: Istanbul Olympic Games Preparation and Organizing Committee
-
Name of Work: Preparation of Settlement Plan of Atatürk Olympic Park, Revised Project Reports (Preliminary, Application, Bill of Quantity Survey), Architectural, Enginnering, and Technical Consultancy Services
Ataturk Olympıc Park
Preparation of settlement plan of Ataturk Olympic Park (585 hectares), and detailed project report of connection roads and residental road with a total length of 26.34 km, 8 culverts, 1 intersection bridge, 2 rotary intersection (102,6 hectares), potable water distribution pipeline system with a total length of 17,334 m, sewage system with a total length of 18,412 m, storm water system with a total length of 25,175 m, natural gas piping systems with a diameter of 200 cm, electrification and telecommunication systems, electric distribution facilities with a total construction area of 1,460 m².